It's been raining here for two days now 😓,so as I can't work outside, I've been working in the van 😃.
The shower is now fitted and all pipework connected, but only cold water running at present.The cold supply has been tested to pressure and there's no leaks.
Cut out another gas drop out hole in the bottom of the kitchen unit.This is under the hob & grill and where the gas manifold is.
Also built the framework above the sliding door to host the switch panels and hide cable runs.This joins onto the wall cupboard above the sink, which is where all the crockery will go.I'll post some pictures tomorrow .
Stephen.
No comments:
Post a Comment